Line 12 (Mumbai Metro) Explained

Mumbai Metro Orange Line 12 Extension
Other Name:Orange Line
Type:Metro
System:Mumbai Metro
Status:Approved
Locale:Navi Mumbai and Thane, Maharashtra, India
Start:Kalyan
End:Taloja
Stations:19
Owner:Mumbai Metropolitan Region Development Authority
Operator:MMRDA
Character:Elevated
Linelength Km:22.17
Tracks:2
Linenumber:12
Map State:collapsed

Orange Line 12 (Extension), or the Kalyan-Dombivli-Taloja Line is a proposed line of Mumbai Metro. It will be an extension of Orange Line. The total length of the line is planned to be 22.17km (13.78miles), and the route will be completely elevated. The total cost of construction is confirmed to be Rs 2037.20 crore.[1] MMRDA approved the Kalyan-Dombivli-Taloja Metro line. There will be 19 stations. This line will connect Navi Mumbai city with Kalyan-Dombivali city.[2]

Delhi Metro authority show red flag to Kalyan-Dombivli-Taloja Metro line.[3] However the construction work is yet to start and is expected to be completed on 2026 with Revenue Opening Date (ROD) as 01/11/2024.MMRDA in its 138th Authority Meeting held on 26/08/2015 vide Resolution No. 1340 has granted In-principle Approval to develop growth Centre in Kalyan Taluka (area approx. 1089 Ha.) through implement

Stations

Line 12 will have 19 stations, all elevated.

Orange Line 12
Station NameStatusConnectionsLayout
EnglishMarathi
1 कल्याण एपीएमसी Under Construction (Partially Under Construction) Elevated
2Kalyanकल्याणUnder ConstructionNoneElevated
3 गणेश नगर (कल्याण) Under Construction None Elevated
4 पिसावली गाव Under Construction None Elevated
5 गोलावली Under Construction None Elevated
6 डोंबिवली एमआयडीसी Under Construction None Elevated
7 सागांव Under Construction None Elevated
8 सोनारपाडा Under Construction None Elevated
9 मानपाडा (डोंबिवली पूर्व) Under Construction None Elevated
10 हेदुतने Under Construction None Elevated
11 कोलेगाव Under Construction None Elevated
12 निळजे गाव Under Construction None Elevated
13 वडवली Under Construction None Elevated
14 बाळे Under Construction None Elevated
15 वाक्लन Under Construction None Elevated
16 तुर्भे Under Construction None Elevated
17 पिसार्वे आगार Under Construction None Elevated
18 पिसार्वे Under Construction None Elevated
19 Amandoot तळोजा Under Construction Elevated

Notes and References

  1. Web site: 2024-02-09 . Gawar Wins Mumbai Metro Line 12’s Construction Contract CA-240 . 2024-02-09 . The Metro Rail Guy . en-US.
  2. Web site: Mumbai Metro 12 Approved.
  3. News: Delhi authority red-flags Kalyan-Taloja Metro line . dna . 2 December 2018.