Type: | Rapid transit |
System: | Xiamen Metro |
Status: | In operation |
Locale: | Xiamen, Fujian, China |
Stations: | 32 (30 in operation) |
Open: | [1] |
Character: | Underground |
Linelength: | 41.642NaN2 |
Tracks: | 2 |
Speed: | 800NaN0 |
Map State: | collapsed |
Line 2 of the Xiamen Metro is a subway line in Xiamen. The line running from to, has 32 stations and is 41.64km (25.87miles) long.[2] It was opened on December 25, 2019.
Segment | Commencement | Length | Station(s) | Name | |
---|---|---|---|---|---|
Wuyuanwan — Tianzhushan | 25 December 2019 | 41.642NaN2 | 29 | Phase 1 & 2 | |
Dongyao | 26 April 2021[3] | Infill station | 1 |
Station name | Connections | Distance | Location | ||||
---|---|---|---|---|---|---|---|
Haicang | |||||||
Huli | |||||||
Siming | |||||||
Xiamen BRT | |||||||
Huli | |||||||
In mid-December 2019, construction works near the Siming District were affected by subsidence. A major water pipe burst, and dirty water flooded the construction site, affecting the concourse, platform and metro lines under construction. The subsidence also caused a collapse of the surface road and a resulting crater of approximately 500sqm. The cause is believed to be a burst water pipe. Water also penetrated the now-opened Lücuo station of Line 1, and flooded the concourse and platform.[4]