Parc Cynog | |
Location Map Caption: | Location of Parc Cynog within Wales |
Coordinates: | 51.758°N -4.526°W |
Country: | Wales, United Kingdom |
Status: | O |
Commissioned: | 2001 |
Owner: | Vattenfall |
Operator: | Nuon Renewables |
Ps Units Operational: | 11 |
Wind Farm Type: | Onshore |
Ps Electrical Capacity: | 8.4 |
Parc Cynog is a wind farm operated by Nuon Renewables in Wales.[1] [2]
Parc Cynog Windfarm was built in 2001, and currently consists of eleven wind turbines.
There were originally five turbines on site which are Micon M1800-750/48 turbines built in 2001, by 2009, a further six turbines were installed by Enercon Wind Energy. The turbine type used was Enercon E48/800KW.
The windfarm is owned by Vattenfall.[3]